What we need from you
- An accountable executive or technical leader
- Access to agreed delivery data and system extracts
- Conversations with three to six key people
- A team that can own measurement and follow-up actions
Development team assessment
We combine delivery metrics, process observation and technical decision paths into a baseline. You then know which constraint to address first.
Thirty minutes. Bring your starting point and the most important open decision. You will receive a clear assessment of whether this entry point fits.
Starting point
Five metrics as a shared delivery languageDORA’s current model uses five metrics to assess software delivery throughput and instability: change lead time, deployment frequency, failed deployment recovery time, change fail rate and deployment rework rate.Open primary source
First paid step
This is a management and delivery diagnosis. A full code, architecture or security audit is outside the scope.
2 to 3 days
from EUR 5,000 net
Base package for one product team, up to five interviews and six months of agreed delivery data for one product area.
All prices are net of VAT. Preparation, delivery, results documentation and the results meeting are included in the stated base scope. Travel and accommodation costs are disclosed before commissioning. If agreed items are missing at handover, Convios completes them within ten working days at no extra fee, provided your data, interviews and decisions were available on time.
01
We agree metrics, data sources, product area and baseline period.
02
Interviews and system extracts expose waiting time, handovers, rework and technical decision queues.
03
The results connect one cause hypothesis with three measures and an observable leading indicator.
Self-assessment
The calculator makes assumptions visible. It starts a conversation but is not a delivery baseline.
DELIVERY COST CHECK
What does maintenance cost your company?
Two inputs, instant result.
Delivery cost check by Convios. Industry average, not individual analysis.
Afterwards
A prioritized measure can become a limited delivery project. The leading indicator, economic target, owner and sign-off criteria are agreed first.
Review all three stagesNo. Missing or inconsistent data can be a finding. We agree the most reliable sources available for the baseline.
No. The subject is workflow, systems, decisions and team metrics.
No. Technical samples may support a hypothesis. A full code audit needs a separate scope.
We review the product area, available data and the decision that the assessment should prepare.
Discuss where to startThirty minutes. Bring your starting point and the most important open decision. You will receive a clear assessment of whether this entry point fits.
The call is exploratory. If there is a fit, you receive a written proposal with the agreed work, fixed fee and sign-off criteria before you decide.